Magnesita - Kiln Duct Replacement
Jared Marcotte, Iron Stag Crane Service
Total Maintenance Solutions contacted us for an emergency Kiln Duct replacement.
The duct was compromised and needed to be replaced immediately.
Unfortunately, the section of duct that needed to be replaced was the only section that was structurally secured to the building.
The adjacent elbows and pipes had bracing but not enough to support themselves if the main duct was removed.
We supplied the cranes and rigging required to safely make the lift.
3D lift plan played a critical role in securing this project for us.
We were able to show them how we were planning on supporting the duct to safely and efficiently remove and install the replacement.
Magnesita's strict safety requirements were easily satisfied with a comprehensive 3D Lift Plan.
It answered all of their questions, instilled confidence and ultimately resulted in securing the project.
With 3D Lift Plan, we were able to show each crane location, the rigging required, and laydown area need to complete the lift.
We showed the capacity of each crane along with the load they would each handle.
3D Lift plan has been a great too for us from project estimation to execution!