Lift Plan of the Year

Gateway Construction
by Stanley Hamilton, Topping Out Inc.
Tornado Response
by Fred Honsinger, Modern Crane
Storage Bin
by Ben Holdaway, Wagstaff Crane Service
Concert Setup
by Adrian Lacey, Sims Crane & Equipment
Brewery Vessels
by Greg Nachtegaele, Armstrong Crane & Rigging
SO3 Monorail
by Steve Phillips, Sterling Boiler and Mechanical
Overpass Build
by Dave Steffens, Lane Construction
Refinery Vessel
by Ronnie Wagstaff, Wagstaff Crane Service

Comments?

Post them on our Facebook page

 
Voting ends March 15th!

Tornado Response

by Fred Honsinger, Modern Crane

Photo of the evaporator tower

When Modern Crane first arrived on site our crane and rigging supervisor, Fred Honsinger, assessed the overall situation and began taking measurements. Utilizing 3D Lift Plan, Mr. Honsinger input his measurements and devised a plan for crane placement and for safely attacking the evaporator tower.

3D Lift Plan drawing submitted to clients for approval

Modern Crane's three dimensional crane simulation program, 3D Lift Plan, allows our clients to view the job site in a full three dimensional environment. Using this software our client can walk inside the buildings, stand on the roof or sit in the operators seat. The accuracy of 3D Lift Plan assures our clients that the cranes selected will perform the tasks required safely and efficiently.

The three dimensional drawing shown on the right along with a written Safe Work Procedure was submitted to our client, Sifto Salt Management, and the Ministry of Labour for approval. The plan was accepted immediately by all parties.

Job Site Photos

Photo of the evaporator tower job site Photo from the top of the evaporator tower Photo looking down from the top of the evaporator tower

3D Lift Plan Images

Evaporator tower job site render from 3D Lift Plan 3D Lift Plan render of the job site zoomed out 3D Lift Plan aerial render of the job site 3D Lift Plan render of the top of the tower